All three move a settling house’s weight onto better ground; they differ in how far down that ground is and how they get there. Concrete underpinning digs under the existing footing, one section at a time, and casts a deeper one: it suits firm soil a short way down. Helical piers are steel shafts screwed into the ground beside the footing; they don’t need the house’s weight to go in, so they suit lighter houses, porches and additions. Push piers are steel tubes driven down using the house itself as the counterweight, until they meet firm soil or rock. In Ottawa, where sensitive Leda clay can run tens of metres deep, the deciding questions are where firm ground is and how the engineer will confirm what the repair can carry. All three are structural repairs designed by a structural engineer (P.Eng).

At a glance

Under­pinning Helical piers Push piers
How it goes in Dug and poured in sections Screwed in Pushed in
Pushes against Nothing; it’s a new footing Nothing; turned by a machine The house’s weight
Suits Firm soil close below Light or heavy houses, additions Heavier houses
Capacity checked by Design and inspec­tions Torque, plus load tests in clay Driving force (proof load)
Engineer required Yes, in Ontario since 2025 Ask the City Ask the City
Canadian evalua­tion Not a product Two found, both past review dates None found

Start with the cause

Ottawa research names falling groundwater, from development and from trees drying the clay, as the main cause of settlement damage here. A repair that doesn’t deal with the cause can leave the rest of the house moving. None of the three fixes sagging floors inside from a beam, posts or joists, and none is the repair for a wall bowing inward: see sloping floors or sticking doors and horizontal crack or bowing wall.

How far down is firm ground?

UK building-control guidance calls mass concrete underpinning “suitable for shallow depth underpinning”, and says groundwater, loose ground or fill need other techniques. Where firm soil is far down, piers carry the load to it instead. At one Ottawa site, sensitive marine clay ran more than 30 m deep before reaching glacial till and bedrock. So ask the engineer what soil each option will bear on: if a new concrete footing sits a metre deeper in the same clay, will it stop settling?

Light house or heavy house?

A push pier can only be driven as hard as the house can push down. A US contractor puts it plainly: “If the structure is too light, the home can start to lift before the pier reaches its target depth.” A sponsored US engineering article adds that a push pier needs high-strength soil to stop against. That is why helical piers are the usual choice for light houses, porches and additions. Canada’s helical-pile evaluations also give loads for pulling (uplift) as well as pushing; the push pier evaluations we read cover pushing loads only. No Canadian source gives a weight limit for push piers; it is the engineer’s call.

How the engineer confirms capacity

  • Helical piers: the torque needed to turn the pier gives an estimate of what it carries. Both Canadian evaluations say that estimate can’t be relied on in sensitive clay without on-site load tests. The uncertainty runs both ways: a US trade magazine says a pier in wet clay may carry more than its torque suggests.
  • Push piers: each pier is driven until the force reaches a proof load the engineer sets, then locked off at a lower working load. One US evaluation puts soft or problem-soil sites outside its scope.
  • Underpinning: the engineer designs the depth, the sequence of sections and the bearing soil, and reviews the work at inspections.

For both kinds of pier, the US evaluations leave the settlement of the finished piers to the design engineer. Ask what movement, if any, to expect afterwards.

The existing footing matters

Pier brackets bolt to the side of the existing footing. The US evaluations cover sound, uncracked concrete only; one says the footing’s own strength isn’t evaluated at all. A crumbling, thin or stone footing may point the engineer to underpinning or a rebuild instead: see rubble and stone foundations.

Neighbours and shared walls

Underpinning digs under the footing, which is a real risk beside a lot line or under a wall shared with a semi-detached or row-house neighbour. Since January 2025 Ontario’s Building Code has required a professional engineer for all underpinning, and Ottawa’s 2022 excavation and shoring advisory adds engineered digs within 3 m of a lot line (details on concrete underpinning). Piers need only a small pit at each one, and the advisory exempts isolated piers and helical piles. Ontario’s Building Code also requires deep foundations to be put in without harming neighbouring buildings.

When each is the wrong fix

  • Underpinning: firm soil far below the footing; high groundwater or loose fill; a shared wall where the neighbour won’t agree to work under it.
  • Helical piers: a cracked or crumbling footing; a contractor who won’t say how capacity will be confirmed in clay.
  • Push piers: a light house, porch, deck or addition; soft ground with no firm layer to stop on; a cracked footing.
  • All three: settlement driven by water or trees with nothing done about the cause.

Lifting the house

Piers can also be used to try to lift a house back. The US evaluations say any lift must be checked by the design engineer and approved by the building official; makers say a lift is possible “in many cases” and none we read promises a level house. Lifting can jam doors and crack drywall. If anyone promises a result, get it, and its limits, in writing.

What it costs

Our independent cost sources (the City and the Intact Centre’s 2024 estimates) have no figure for any of the three, and the prices we found elsewhere weren’t solid enough to publish. For a fair comparison, ask each contractor to quote on the same engineer’s design, and check whether the price includes the engineer’s fees and reviews, the permit, any load test, extra depth, and restoring the yard. Contractors’ own published prices appear on each repair’s page as we check them.

Warranties

For piers there are three different promises: the maker’s product warranty (one gives 25 years against manufacturing defects), the installer’s workmanship warranty, and any promise that the house won’t move again, which few give. For underpinning, Tarion’s new-home warranty doesn’t cover renovations, so the warranty is whatever your written contract says.

Questions to ask the engineer

  • What is causing the settlement, and does this plan deal with it?
  • What soil will each option bear on, and how deep is firm ground here?
  • Why this method rather than the other two?
  • Is my footing sound enough for pier brackets?
  • How will capacity be confirmed: by torque, proof load or a load test?
  • Is the house heavy enough for push piers?
  • Will the work touch a shared wall or a neighbour’s footing?
  • Stabilise only, or lift? Who sets the limit, and is it in writing?

Sources

  • ICC Evaluation Service, ESR-3074 (helical; US, reissued July 2025), ESR-4317 (push piers; US, reissued September 2026) and ESR-5005 (push piers; US, reissued October 2026).
  • Canadian Construction Materials Centre, helical pile evaluations 13193-R (revised 2017) and 13675-R (2014).
  • Local Authority Building Control, Underpinning existing foundations (UK, 2018).
  • Geoengineer.org, comparison of residential foundation repair options (US, sponsored, 2022).
  • DiBernardo, Working with helical piers, Journal of Light Construction (US, 2012).
  • Dalinghaus Construction, push pier limitations (US contractor; 2021, updated 2026).
  • Tavakkoli, Oh and Vanapalli, review of Ottawa’s sensitive clays (2024); Saadat and Dunstan, Ottawa sensitive clay site paper (2019).
  • Township of Clearview, guide to the 2024 Ontario Building Code changes (November 2024); Ontario Building Code, Division B 4.2 (2012/2017 text, unofficial copy).
  • City of Ottawa, Excavation and Shoring – Part 9 advisory (June 2022).
  • Home Construction Regulatory Authority, Hiring a builder or contractor; Supportworks warranty page (manufacturer).

Start a request

Contractors who offer these repairs

Contractors who offer helical piers, push piers or concrete underpinning
ContractorWarrantyPasses to a new ownerCoversEngineeringFacts with proof
Mr Foundation IncUnknownYes, automaticallyUnknownOutside engineering firm13
Just FoundationsLifetimeYes, automaticallyLabour and materialsUnknown11
Pro-Core Foundation RepairUnknownUnknownUnknownUnknown10
A&Z Helical Screw PilesUnknownUnknownUnknownOutside engineering firm8
Foundation Repair ExpertsUnknownUnknownUnknownUnknown8
Ottawa Structural Residential ServicesUnknownYes, automaticallyUnknownUnknown8
The Foundation Guys Inc.25 yearsUnknownUnknownUnknown8
Tierney Foundation RepairUnknownUnknownUnknownOutside engineering firm7